|
Title: |
GSWR 3309 and 3311 await their next assignment in the Bay Line Yard. |
Description: |
GSWR 3309 and 3311 await their next assignment in the Bay Line Yard. |
Photo Date: |
5/30/2011 Upload Date: 7/2/2011 4:04:34 PM |
Location: |
Dothan, AL |
Author: |
Andy Tucker |
Categories: |
Roster,Yard |
Locomotives: |
GSWR 3309(SD40-2) GSWR 3311(SD40-2) |
Views: |
649 Comments: 2 |
|
|
|
Title: |
Hilton and Albany RR |
Description: |
My first photo of GWI's new Hilton and Albany RR subsidiary that operates former CofG/Southern/NS trackage between it's namesake towns. GWI now controls the entire line from Albany GA to Panama City FL via Dothan AL. The units seen here formerly operated on the Georgia Southwestern which GWI also operates and whose tracks this train will cross over in about 10 miles at Arlington GA. |
Photo Date: |
1/6/2012 Upload Date: 1/7/2012 9:30:43 AM |
Location: |
Blakely, GA |
Author: |
Bryan Smith |
Categories: |
|
Locomotives: |
GSWR 3309(SD40-2) GSWR 3311(SD40-2) |
Views: |
832 Comments: 3 |
|
|
|
Title: |
Hilton and Albany |
Description: |
The newest addition to the GWI stable, The Hilton and Albany RR, is seen arriving Hilton GA on former CofG/Southern/NS trackage. The HAL took over the section from Albany to Hilton and now operate the entire line between Albany and Dothan. |
Photo Date: |
1/11/2012 Upload Date: 1/17/2012 5:37:11 AM |
Location: |
Hilton, GA |
Author: |
Bryan Smith |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) GSWR 3309(SD40-2) |
Views: |
562 Comments: 1 |
|
|
|
Title: |
Big time railroading |
Description: |
A Hilton and Albany RR crew are arriving Hilton on NS units with a 57 car coal train for the CIRR. The NS units will cut off and pull down the pass and tie up behind the HAL's regular power of 2 SD40-2's seen in foreground. The CIRR has just delivered a cut of cars into a yard track and as soon as the NS units cut off, the CIRR units will couple on and take the coal train the final miles to it's ultimate destination at the GA Pacific paper mill in Cedar Springs GA. |
Photo Date: |
1/29/2012 Upload Date: 2/4/2012 10:41:29 AM |
Location: |
Hilton, GA |
Author: |
Bryan Smith |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) GSWR 3309(SD40-2) |
Views: |
544 Comments: 1 |
|
|
|
Title: |
Hilton and Albany regular power and NS coal train power |
Description: |
The HAL's regular power sits in the passing track as power from a coal train sits tied down behind it. The Hilton and Albany RR crew brought down a coal train for the CIRR then returned to Albany via pick up truck to get another coal train....this one destined for the paper mill at Panama City FL. They made it back about nightfall and tied down for the night. The next day a crew got the Panama City coal train and used the NS power all the way to Panama City. |
Photo Date: |
1/29/2012 Upload Date: 2/4/2012 10:42:35 AM |
Location: |
Hilton, GA |
Author: |
Bryan Smith |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) GSWR 3309(SD40-2) |
Views: |
572 Comments: 1 |
|
|
|
Title: |
Hilton and Albany |
Description: |
The HAL local is about to leave Hilton enroute to Albany with a pair of former GSWR SD40-2's for power. |
Photo Date: |
3/25/2012 Upload Date: 4/29/2012 8:27:44 AM |
Location: |
Hilton, GA |
Author: |
Bryan Smith |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) GSWR 3309(SD40-2) |
Views: |
596 Comments: 2 |
|
|
|
Title: |
Hilton and Albany power |
Description: |
The power for the Hilton and Albany RR is seen along with a former BN SD40-2 that is headed for the CIRR shops at Cedar Springs for a coat of GWI corporate orange/black. |
Photo Date: |
5/27/2012 Upload Date: 5/27/2012 6:23:58 PM |
Location: |
Hilton, GA |
Author: |
Bryan Smith |
Categories: |
|
Locomotives: |
BAYL 510(GP38-2) GSWR 3311(SD40-2) |
Views: |
406 Comments: 0 |
|
|
|
Title: |
GSWR 3309 |
Description: |
Got a picture of the GSWR 3309 & 3311 on my way home. |
Photo Date: |
6/1/2012 Upload Date: 6/5/2012 12:19:43 AM |
Location: |
Hilton, GA |
Author: |
David Barrentine |
Categories: |
Roster,Yard |
Locomotives: |
GSWR 3309(SD40-2) GSWR 3311(SD40-2) |
Views: |
413 Comments: 1 |
|
|
|
Title: |
GSWR 3311 |
Description: |
Power sitting outside of the Bay Line shops. A Utah Railway GP35 long hood sits on a flat car. |
Photo Date: |
8/31/2012 Upload Date: 9/2/2012 5:50:50 PM |
Location: |
Panama City, FL |
Author: |
Charles Burgess |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) LRWN 1542(SW1504) GSWR 3309(SD40-2) CAGY 3353(SD40-2) |
Views: |
1088 Comments: 1 |
|
|
|
Title: |
GSWR 3311 |
Description: |
|
Photo Date: |
8/31/2012 Upload Date: 9/2/2012 6:11:17 PM |
Location: |
Panama City, FL |
Author: |
Charles Burgess |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) |
Views: |
412 Comments: 1 |
|
|
|
Title: |
GSWR unit |
Description: |
A former GSWR SD40-2 is seen at the CIRR shops at Cedar Springs just before receiving a coat of corporate orange/black. The CIRR shop facility is laying waste to several short line schemes in the area and steadily cranking out units in the corporate scheme. |
Photo Date: |
12/2/2012 Upload Date: 1/20/2013 5:48:44 AM |
Location: |
Cedar Springs, GA |
Author: |
Bryan Smith |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) |
Views: |
579 Comments: 0 |
|
|
|
Title: |
BAYL units off Dothan road train resting by shop at Panama City the day after Thanksgiving. |
Description: |
|
Photo Date: |
12/31/2013 Upload Date: 1/29/2013 10:56:46 PM |
Location: |
Panama City, FL |
Author: |
Hank Stephens |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) |
Views: |
396 Comments: 1 |
|
|
|
Title: |
BAYL units resting at Panama City shops already showing changes after GWI purchased Rail Asset Management, previous owner of the AN, BAYL and AG |
Description: |
|
Photo Date: |
12/31/2013 Upload Date: 1/29/2013 10:57:34 PM |
Location: |
Panama City, FL |
Author: |
Hank Stephens |
Categories: |
|
Locomotives: |
GSWR 3311(SD40-2) BAYL 1597(GP15T) |
Views: |
763 Comments: 4 |
|
|
|