NS 9361 Being Re-Railed         
At 22:55 on 12-29-2003 loaded grain train G-SJOLAR9-26 (BNSF 4648, NS 9361, BNSF 1032, 103 loads, 0 empties, 13,789 tons, 6087 feet) failed to stop at the red signal at the west siding switch at Pauls Valley. This trian struck train H-PTRSTL9-28 (BNSF 4349, BNSF 4866, ATSF 609, 22 loads, 45 empties, 4222 tons, 3809 feet) as it was taking siding. This resulted in the derailment of the three locomotives on G-SJOLAR9-26 and four cars (OCPX 62871, DOWX 79567, DOWX 79678, and NATX 82801) on H-PTRSTL9-28. This series of photographs documents the recovery process from first light through the ballasting of the installed track panels late in the evening. The main track was placed back in service at 15:05 on 12-30-2003. This photo shows Hulcher sidebooms rerailing engine NS 9361.
Date: 12/30/2003 Location: Pauls Valley, OK   Map Show Pauls Valley on a rail map Views: 479 Collection Of:   Christopher Palmieri
Locomotives: NS 9361(C40-9W)    Author:  Christopher Palmieri
NS 9361 Being Re-Railed
Picture Categories: Scenic,Action This picture is part of album:  2004 Scans - CMP
Share
User Comments
Name Type Comments Date
David Stewart General Nice shot! 9/22/2009 8:48:38 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1767512