The dump truck is on the main line. The long curve before the 2 mile tanget to Washington Jct begins here. Camera is looking time table east. |
Date:
7/25/2009 |
Location:
Ellsworth, ME Map ![Show Ellsworth on a rail map](/images/map_us.gif) |
Views:
188 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
|
Author: David Larrabee
|
![Clearing the Freight Yard](http://s3.amazonaws.com/rrpa_photos/49064/2009%20Summer%20DSRX%20Work%20027.JPG) |
Picture Categories: RollingStock,Yard,Track,Action |
This picture is part of album: Working on the Downeast Scenic RR |