Advanced Approach         
Signals are cleared for Capitol Corridor train #744. The yellow-over-yellow dwarf signal is an advanced approach, telling the engineer to be prepared to stop at the second signal. The signal on the signal bridge at CP Shark shows a red-over-green aspect. This indicates to the engineer he may proceed at medium speed for two signal blocks. For train #744, this signal will give him clearance all the way to Santa Clara, two blocks up the line. The advanced-approach dwarf signal will improve to clear (green-over-red)
Date: 3/19/2022 Location: San Jose, CA   Map Show San Jose on a rail map Views: 40 Collection Of:   Lucas Connor
Author:  Lucas Connor
Advanced Approach
Picture Categories: Station,Signal,Track This picture is part of album:  Railfanning the Peninsula: San Jose to Lawrence, January-June 2022
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5752795